DHI Project Portfolio
By world region:
By technical area:
- Aquatic Ecology
- Capacity Building and Training
- Cleaner Production/Cleaner Technology
- Coastal Engineering
- Coastal Zone Management
- Ecological Modelling
- Ecotoxicology
- Environmental Impact Assessment
- Estuarine Dynamics
- Flood Management
- Groundwater Soil and Waste
- HydroInformatics Technologies
- Hydrological Modelling
- Monitoring and Information Technology
- Offshore Technology
- Ports & Hydraulic Structures
- River Hydraulics
- Survey & Monitoring
- Urban Water Utilities
- Wastewater & Process Technology
- Water Management
- Water Quality Assessment
Last updated: 2013-05-22
Hydrological Modelling
Integrated Water Resources Management in the Kabul River Basin
Integrated Water Resources Management project in the Kabul River Basin is financed by the Ministry of Energy, Iran. It consists, among other things, of the following elements: 1) Water resources assessment including assessment of the water availability in time and space and the water demands in the different sectors, 2) Setting up a river basin model for the basin, and 3) Proposal for future water development projects to meet the water requirements by different water users in the basin. The latter involves simulation and optimization of a number of scenarios based on proposed projects and development options.
Afghanistan, 2003-2005
SCA FLOOD WATCH Installation
Installation of Flood Watch for Sydney catchment Authority
Australia, 2005-2006
Barind area irrigation model
In order to optimise groundwater and surface water use for irrigation purposes a groundwater model as well as a management information system is developed covering the Barind area. Among other issues the system is used to investigate the impact on the water balance from installation of a number of deep tubewells in the area.
Bangladesh, 2006
Leie-Bovenschelde Rreal-time Flood Forecasting System
Upgrading of MIKE 11 RR/HD model for forecasting purposes and provision of FLOOD WATCH system
Belgium, 2005-2007
Dender, Demer and Grensmas on-line Flood Forecasting Models
MIKE FLOODWATCH, data assimilation, updating, MIKE 11 flood forecasting, training
Belgium, 2004-2005
THORSA RIVER, FLOOD MITIGATION AND LAND RECLAMATION PROJECT. Phase I and II
Hydrological study, 1D and 2D modelling, preliminary design of river training and land reclamation works, cost estimation and economic analysis.
Bhutan, 2005-2007
Okavango Delta Management Plan
The project will provide input to the Okavango Delta Management Plan through the implementation of a comprehensive integrated hydrologic model of the entire data, employing MIKE SHE and MIKE 11; and support to data management, long-term research, knowledge dissemination and public participation.
Botswana, 2003-2006
Brunei Drainage Master Plan
The overall objective of the Drainage Master Plan is to provide a long term strategy for reduction of impacts of flooding and flood liability on individuals, and by reducing losses resulting from flooding.
The study will be the benchmark for floodplain and urban drainage management in Brunei.
Brunei, 2004-2006
Development of Flow Rules for the Mekong River
A part of the Water Utilization programme (WUP) at MRC, is concerned with development of water sharing rules for the Mekong river. This particular project s examines the details of the cause and effects of one important part of the river, namely the flow reversal in the Tonle Sap river.
Cambodia, 2004
Mekong Flood Mapping for 2003
The project involves design and development of a system, which automatically carries out hydraulic modelling and produces flood maps for the rivers, and flood plains of Cambodia. The MIKE 11 and MIKE 11 GIS models used haves been developed through various projects for the Mekong River Commission Secretariat (MRCS).
Cambodia, 2003
Songhua Flood Management and Forecasting Project
Flood management and forecasting, decision support system, web technology, ArcGIS SDE, ORACLE, SQL SERVER, DHI Software
China, 2004-2005
Carrying Capacity of Water Resources in HaiHe Basin
The GIS based MIKE BASIN model was established and used for optimization of the water utilization. Methods were developed for estimation of the needed water quantity and quality for protection of the environment. Evaluation of trade-off between water for environmental protection and for urban/industrial/agricultural development interests.
China, 2003-2004
Århus Nord - well protection zones for groundwater pumping scenarios and updated hydrogeological model
The MIKE SHE - MIKE 11model system was applied to make an environmental impact assessment of new groundwater pumping scenarios. An existing integrated hydrological model previously developed of DHI was updated and extended. New capture zone delineations were used by the client in well field protection plans.
Denmark, 2009
Flooding in Greve caused by high sea levels in Køge Bay.
MIKE FLOOD modelling of Greve
Denmark, 2008-2010
Climate change impact on flooding in Greve
Development of the modelling framework for calculation of Flood risk in Greve city
Denmark, 2008-2009
Drainage of a coastal, agricultural catchment influenced by climate change
Investigation of flooding in the Gerå coastal,agricultural catchment using the integrated groundwater and surface water modelling tools MIKE SHE and MIKE 11.
Denmark, 2008-2009
MIKE SHE assistance, MC Roskilde
MC Roskilde needs an integrated modelling tool for a range of water management tasks addressing both surface water, ground water and the interaction between the groundwater aquifers and streams. The tool must be dynamic and distributed. MC Roskilde has decided to develop the tool on the existing national water resources model with major inputs from DHI. The MIKE SHE / MIKE11 modeling system developed by DHI is applied.
The extended and calibrated model is developed to support both regional scale and local scale models ranging from 25 m to 500 m in spatial resolution.
Denmark, 2007
Clean Water in River Mølleå
Lake and stream restoration assessment and effect evaluation of discharging treated sewage in the river system. Technical and financial assessments.
Denmark, 2007
Impact of climate changes in Greve municipality
Impact from long term climate changes on groundwater levels in a coastal area is investigated through scenario modelling using MIKE SHE. Risk for leakage into sewer systems and buildings is also assessed.
Denmark, 2006-2007
Studstrupværket - 2. phase
Evaluation of the environmental impact from increased groundwater pumping.
Denmark, 2006-2007
Evaluation of N-sensitive zones in the catchment area to Limfjorden
Evaluation of N-sensitive zones in the catchment area to Limfjorden in Denmark using integrated groundwater-surface water modelling (MIKE SHE/MIKE 11).
Denmark, 2005-2006
Well-field and water resources management in the Hove å river basin west of Copehagen
New permits for the well-fields of the Copenhagen water company will be based on principles of sustainability in relation to the groundwater resource itself and also river quality and nature protection in general. (as also included in the EU Water Framework Directive, WFD)
In the project area (Nybølle) west of Copenhagen there are many important wetlands and for the rivers quality criteria include that the are habitats for fish.
In the project DHI Wate & Environment has used their groundwater-surface water model complex (MIKE SHE -MIKE 11) to evaluate the dry season river flow in the Hove Å river basin and the groundwater level in the wetland areas.
Denmark, 2005
Skive Fiord Catchment Model
An integrated surface water and groundwater model coupled to a reactive transport model is developed for Skibe Fiord Catchment in order to investigate the transport and attenuation of nitrate from agricultural activities in the catchment.
Denmark, 2004-2005
Regional Groundwater Protection by optimised organic farming system
The project is set up to investigate whether some of the management steps that characterise organic farming systems can change both quantity and quality of the groundwater compared with conventional farming. This particular concerns hydraulic parameters and dissolved organic carbon from the plough layer, which may promote a DOC-driven denitrification of leached nitrate in the subsoil.
Denmark, 2004-2005
Hydraulic assessment and evaluation of restoration options for the stream Nordkanal-Søborghus Rende
Storm-water overflow causes flooding and backwater effect that pollute the Lake Utterslev. A MIKE 11 model was used for analyzing the effects of change design of the stream and the lake outlet for reduction of pollution load to the lake, improving the fauna passage and prevented flooding.
Denmark, 2003-2004
Catchment modelling of N load to Ringkøbing Fiord
The catchment N load to Ringkøbing Fiord has to decrease in order to maintain the ecological status of the Fiord. An advanced, integrated flow and transport model based on MIKE SHE and MIKE 11 is developed and used to assess the impact of various changes in the catchment to the Fiord.
Denmark, 2003
Danish Water Environment Plan III
Various measures to reduce nutrient load to Odense Fiord are evaluated through the development of an integrated surface water and groundwater model. The model is based on the MIKE SHE and MIKE 11 modelling codes.
Denmark, 2003
Nile Basin Climate Change
The objective of this project is to assist the Ministry of Water Resources and Irrigation, Egypt to assess the impact of climate change on the water resources in the Nile Basin and in particular the inflow to the High Aswan Dam (HAD).
Egypt, 2008-2010
Hydraulic study for GIFT Project
DHI carried out a modelling study for a planned Gujarat International Finance City (GIFT) between Gandhinagar and Ahmedabad. The study involved determination of design flood levels, design of barrages to create a waterfront at the GIFT City through hydrological and hydraulic modelling, a study of the potential sedimentation problems associated with the barrages, water quality issues and the drainage system around the city.
India, 2008-2009
GMR Hydro Power Project
Support to DHI India for estimation of snow generated run-off to reservoir and evaluation of reservoir sedimentation.
India, 2006-2007
Real-Time Modelling of the Aras River and Establishment of DSS system of the Aras River Basin
Establishment of snowmelt, rainfall- runoff and water allocation modelling of the 100,000 km'2 Aras Basin, shared between Iran, Turkey, Azerbaijan and Armenia. Implementation of a Decision Support System for infrastructure operation to serve the various water users.
Iran, 2004-2005
Hydrometry & Hydrology study of Lough Neagh & Lower Bann
Model support for Kirk McClure Morton in setting up a MIKE FLOOD system including MIKE 11 advanced control structure module for controlling hydraulic conditions in regulated river reach downstream of the lake; Lough Neagh
Ireland, 2004-2006
Building Adaptive Capacity to Climate Change in Kenya
The two key objectives of the project are 1) to provide a better knowledge foundation of possible future climate change and its impact on the water resources. 2) to prepare a modelling tool which WRMA can use to support the planning of adaptation measures.
Kenya, 2010-2012
KWSP-II MB Training
DHI has carried out an extensive MIKE BASIN on-the-job training programme for all six regions of the Water Resources Management Authority in Kenya. It included data handling, water resources assessment and water allocation modelling, using Temporal Analyst Enterprise and MIKE BASIN.
Kenya, 2008-2009
Tools for Groundwater and Surface Water Analysis during Implementation of the Water Framework Directive
Implementation of model tools for surface and groundwater analysis using MIKE 11, MIKE BASIN and MIKE SHE. Assessment of water quality in line with the requirements in the EU Water Framework Directive.
Lithuania, 2003-2004
Paya Indah Wetland - Training
Paya Indah Training - Malaysia. MIKE SHE and MIKE 11 training in connection with the wetland project Paya Indah Wetlands. Training in the use of the integrated model, and project help for updating the existing MIKE SHE - MIKE 11 model, and defining new scenarious.
Malaysia, 2006
Environment Waikato Flood Forecasting System
Real-time flood forecasting, MIKE FLOOD WATCH, MIKE 11 DA, WWW
New Zealand, 2004-2005
Panama Canal Basin Extreme Flows
An integrated and distributed hydrological model in combination with a dynamic river hydraulics model has been developed for risk assessment considering dam operation rules and 1,000 years stochastic rainfall time series.
Panama, 2008-2010
MIKE FLOOD WATCH Slovenia
Development of a forecasting system for Mur River in Slovenia. The Forecasting system is a part of the transboundary forecasting system for Mur River. Automatic Forecasting is performed at the international forecasting centre in Graz, Austria.
Slovenia, 2005-2006
Multi-sector Water Resources Planning Project Sri Lanka
Water resources planning project implementing a nation-wide DSS with a GIS based Knowledge Base for water resources data and water allocation models. The DSS facilitates identification, evaluation and prioritization of water resources investment projects.
Sri Lanka, 2009
Animation of groundwater processes
An interactive animation tool for presentation of groundwater processes such as recharge, flow, draw down, transport of pollutants and saltwater intrusion is developed as part of training programme for groundwater managers.
Sri Lanka, 2006
Catchment deliniation of a large number of lakes
In connection with the Water Framework Directive DHI carry out a detailed GIS analyses of the cathcments for a large number of lakes in the Northern Sweden.
Sweden, 2006
Citytunnel, Malmö, Groundwater Issues
During the construction of the underground train tunnel and stations in Malmö the DHI has supervised the Swedish Railways on groundwater issues including groundwater lowering and re-infiltration to maintain lowest possible environmental impact and minimise pumping yield.
Sweden, 2005-2006
Testing of Models for Risk Assessment under Swedish Conditions
Alternative model codes for risk assessment will be tested for two sites in Sweden. The model codes include advanced and simple codes and recommendations on the different approaches have been developed.
Sweden, 2005-2006
Nuclear Waste modelling
The spreading of nuclear waste contaminated groundwater to a wetland and to surface water bodies in a discharge area in Sweden will be investigated through the application of an integrated hydrological model.
Sweden, 2005
Flood Modelling and Management for ESAN River Basin
Short and Medium Term Flood Forecasting and Management plus Water allocation modelling. Developed in a MIKE Customized environment.
Thailand, 2013-2014
Flood Management and Forecast Modelling for Greater Chaophraya River Basin
Water management system is based on MIKE Customised adapted to meet specific user requirements.The system incorporates a range of MIKE by DHI models.
Thailand, 2012-2013
Wang Flood Forecasting and Warning project
Setup of hydrological and hydraulic MIKE 11 forecasting models. Set-up and installation of MIKE FLOOD WATCH.
Thailand, 2009
Nakhon Sri Thammarat Flood Forecasting and Warning Project
Software and services
Thailand, 2009-2011
CHI-MUN Telemetry Project for DWR
Real-time flood forecasting, MIKE 11, MIKE FLOOD WATCH, data assimilation, GIS, web
Thailand, 2006-2007
Ping River Basin Flood Forecasting Project
Development of a real-time FLOOD WATCH flood forecasting system for Ping River Basin, Thailand.
Thailand, 2005
Ubol Ratana Dam - Flood Watch
Development of a real time forecasting system for the inflow forecasting to Ubol Ratane Dam in Thailand.
Thailand, 2005-2006
Chantabury Phase II
MIKE 11 DA, Floodwatch, Real-Time Flood Forecasting, Telemetry, GIS
Thailand, 2004-2005
Bangkok Flood Forecasting
Setup and customisation of the MIKE 11 hydrological and hydraulic models. Employment of MIKE 11 the data assimilation module for forecasting purposes. Setup and customisation of MIKE FLOODWATCH
Thailand, 2004-2005
Lake Kyora Restoration
The Kyoga Lake on the Equatorial Nile has been blocked by floating islands of detached vegetation. DHI is responsible for establishment of lake water balances and detailed hydraulic analyses of dredging scenarios that will result in the most appropriate future lake water levels.
Uganda, 2006-2007
San Diego County Flood Forecasting
Real-time flood forecasting for flood warning in San Diego, CA.
USA, 2008-2011
EAA MIKE SHE Support
MIKE SHE support in developing an integrated surface water/groundwater model for an agricultural area in the southern part of Florida, USA.
USA, 2005
Forecasting of Selenium in the Delta Mendota Canal, Ca, USA
Set-up of a hydrodynamic/water quality MIKE 11 model for the Delta Mendota Canal.
USA, 2004-2005
South Boulder Creek Flood Analysis
*Hydrologic, Hydraulic Modeling
*Flood Inundation Modeling and Mapping
* GIS
USA, 2003-2004
Climate change impacts on Water resources in Vietnam
Quantification of Climate Change Impacts on Water Resources of all major river basins in Vietnam.
Vietnam, 2008-2010
BENEFITS ON CLIMATE CHANGE ADAPTATION FROM SMALL AND MEDIUM SCALE HYDROPOWER PLANTS
DHI is assisting the Hydrometeorological Institute to assess and explore the potential of small scale hydropower for contributing to CC mitigation, generate CC adaptation benefits and support rural development using the northern Lao Cai province as a pilot case.
Vietnam, 2007-2008
Song Bung hydropower project
As a component of the Song Bung hydropower project includes technical assistance on hydrology, hydrodynamics and sediment transport in the upstream basin of the dam area. DHI carried out hydrological and hydrodynamic assessments to support the project implementation.
Vietnam, 2005-2006